Migration Execution Guide

You've assessed readiness. Now execute the migration. This guide covers timeline planning, risk mitigation, testing protocols training, and go-live. A checklist for managing your FactoryTalk Optix migration.

Timeline & Project Planning

Milestones

Define clear milestones and target dates for your migration project.

Item Target Date
Discovery phase complete
Development environment ready
Architecture training complete
Template strategy defined
Team training complete
Screen migration 50% complete
Screen migration 100% complete
Factory Acceptance Testing (FAT)
Site Acceptance Testing (SAT)
Go-live

Risk Assessment

Identify potential risks and plan mitigation strategies.

Item Mitigation Plan
Insufficient architecture understanding
Scripts and Global Objects identified
Tight timeline
Limited Optix experience
Critical 24/7 operation
Complex integrations

Rollback Strategy

Ensure you can revert to ME if critical issues arise during deployment.

Item Notes
Parallel operation period planned Duration:
Rollback procedure documented Y/N
ME backup preserved Backup location:

Testing & Validation

Factory Acceptance Testing (FAT)

Plan comprehensive testing in your facility before deployment.

Item Notes
FAT created Y/N
FAT schedule defined Date:
Acceptance criteria established Criteria:

Site Acceptance Testing (SAT)

Validate the system in the production environment with operator input.

Item Notes
SAT created Y/N
On-site testing schedule Date:
Operator validation sessions Sessions:
Performance benchmarks defined Benchmarks:

Testing Checklist

Verify all functionality works correctly before go-live. This is a high level reference that should be molded to your project.

Item Notes
All screens accessible via navigation
Tag bindings functional
Alarms triggering correctly
Data logging working
Trends displaying correctly
Recipe load/save functional
User permissions enforced
Multi-language switching works (if applicable)
Performance acceptable (< 2s screen load)
No log errors on Panel Deployment
Cross-browser compatibility (if web clients)
Mobile/tablet responsive (if applicable)

Operator Training & Documentation

Operator Training

Ensure operators are comfortable with the new Optix interface before go-live.

Item Notes
Operator training materials created
Training schedule defined
Hands-on training sessions
Operator feedback collected
Sign-off procedures

Documentation

Create comprehensive documentation for engineers, operators and maintenance personnel.

Item Notes
Technical Specifications Y/N:
Operator quick reference guide Y/N:
Troubleshooting guide Y/N:
User manual created Y/N:
As-built drawings updated Y/N:

Go-Live Preparation

Pre-Launch Checklist

Verify all critical items are complete before cutover.

Item Notes
All testing complete Completion date:
Operator training complete Completion date:
Documentation finalized Document location:
Backups verified Backup location:
Support plan in place Support contact:
Go-live date confirmed Date:
Rollback plan ready Plan:

Post-Launch Support

Plan for intensive support during the critical period after go-live.

Item Notes
Hypercare period defined Duration:
Support coverage Coverage:
Issue tracking system System:
Escalation procedure Procedure:

Project Success Indicators

Your migration is successful when:

  • All screens function correctly with proper tag bindings
  • Operators can perform their daily tasks without referring to ME
  • Performance meets or exceeds ME response times
  • No critical issues remain unresolved after hypercare period
  • Your template architecture enables rapid configuration of new machines
  • Team is confident in maintaining and extending the Optix application

Get Expert Help

Need assistance executing your migration project?

ASQI LLC specializes in FactoryTalk Optix migrations, offering:

  • Migration project management
  • On-site implementation support
  • Testing and commissioning assistance
  • Post-launch troubleshooting
  • Ongoing support and optimization

Contact ASQI →


This guide may be distributed freely for non-commercial use. Attribution to ASQI LLC is appreciated.


Migration Strategies: Port, Redesign, or Hybrid? — Choose the right migration approach before starting execution.

Testing & Go-Live — After execution, follow this validation and deployment guide.

Development Best Practices for Optix — Coding standards and project structure for your migration implementation.